We have a new station at Ashley Down! The station opened for fare-paying passengers on Saturday 28th September 2024. This station, built at a cost of around £12 million, is the second to open as part of the MetroWest programme.
First train
The first train left Bristol Temple Meads at 07.25, where the ticket office was doing a roaring trade selling tickets to this new destination. The two-car unit was well filled with campaigners, enthusiasts, and families just wanting to experience the first train to stop at Ashley Down since 1964.
The atmosphere on board was joyous, with many familiar faces. Passengers cheered when the train’s public address system announced that ‘the next station is Ashley Down’. The driver popped out of his cab to take a bow. On the platform, the dispatcher flagged the train away with a broad grin.

Large crowds
There were large crowds awaiting us at Ashley Down when we arrived. This looked like a good indicator of how much goodwill the new station has generated. Although the station has few frills, it has everything it needs – it is accessible, and has shelters, ticket machines, bike parking, and platform space for a 5-car trains and even Wi-Fi. It was also good to see the Concorde Way cycle path open again.

Potential
The current hourly train service from Temple Meads to Filton Abbey Wood may disappoint some potential users. However services will be extended to Brabazon/North Filton and Henbury half-hourly once those stations are delivered. We think this station has the potential for a more frequent service to a bigger range of destinations, and will campaign for this.
We were given the opportunity make our case for our Plan for Rail to YouTuber Michael C – his video is here:
There is a disparity between fares on the Severn Beach line and other local stations, and will continue to campaign for a fairer, zonal fare system for the Bristol and Bath area.
We will carry on pressing for better integration with local bus services, and for a new station at Lockleaze to further unlock the potential of this railway. And of course we still need to carry on making the case for electrification.
And we haven’t forgotten Portishead, or Pilning, or the other stations in our Plan for Rail.
There’s so much still to do. But this was a good day!


Leave a Reply